• No. 60163 Tornado
  • No. 2007 Prince of Wales
  • No. 3403 V4 Project
  • Facebook
  • Twitter
  • Home
  • About the P2 Project
    • The Team
    • Darlington Locomotive Works
    • Virtual 3D Tour of DLW
  • History
    • History of the Gresley class P2s
    • Nigel Gresley
    • Original P2s
  • Building a new class P2
    • Design Study
    • Construction
    • P2 Progress
  • Supporting No. 2007
    • Become a regular donor/covenantor
    • Join The Boiler Club
    • Join The Motion Club
    • Join The Tender Club
    • Join The Turbogen Club
    • Subscribe to The P2 Support Coach Appeal
    • Sponsor a component
    • The Pony Truck Club – Complete!
    • The Cylinder Club – Complete!
    • The Mikado Club – Complete!
    • The Founders Club – Complete!
    • Volunteering
    • Establish a Legacy
  • News
    • News
    • Mikado Messenger
    • The Communication Cord
  • Events
  • Facebook
  • Twitter
  • No. 60163 Tornado
  • No. 3403 V4 Project

Construction

P2 locomotive and tender frame progress.

08/01/202129/12/2020

Locomotive frames – With the engine’s frames erected, all the major frame stays, brackets, horn blocks, axle boxes & buffers have been cast and fitted using around 1,000 driven bolts.  With the tender tank undercoating complete it has been possible to remove the wheelsets from under the engine frames. This has permitted fitting of the remaining driven bolts and cold turned rivets in the outside motion brackets and the spring hangers.

We now have the profiles for the “shelf” under the back of the cab and Ian Matthews has started making some special tooling to facilitate hot bending of the 20mm thick plate to form the flanges on each end which mate with the outer Cartazzi frame plates. Normally, shaping like this is carried out cold using a brake press forming a series of small bends, however, the radius required in this case is equal to the thickness of the material necessitating the bending to be undertaken at red heat. In this condition the metal, which is 20mm thick,  will be sufficiently pliable to be bent using form tools in our 30ton press. As it is important that the finished article is a good fit between the outer frames, doing the work in house as opposed to by a plate bending firm will enable subtle adjustments to be made to ensure a tight and parallel fit.

The “shelf” bending jig – Leigh Taylor

When fitted to the frames, the shelf will complete the frame structure and enable Ian to start fitting the electrical trunking under the cab which is relatively complex as the 3D CAD view shows.

3D CAD view of the trunking on the shelf. – Alan Parkin

Tender – Steady progress with the tender frames continues at Ian Howitt’s works at Crofton. The initial machining of the hornblocks has been completed, the hornblocks dispatched to NVES in Darlington for welding on manganese steel liners (NVES, thanks to our activities over the years, maintain a welding procedure for welding manganese steel to cast or mild steel), and are now back at Crofton for final machining. Many details for the brake linkage and hand brake mechanism have been made including the brake cross stay and brake cross shaft.

Tender hornguides with manganese steel liners welded in place. – Daniela Filová

The hornguides being set up on the tender frames. – Ian Howitt Engineering

Cylinder block update.

01/01/202128/12/2020

Alan Parkin has now produced several manufacturing drawings for the approximately 140 individual components which are required to fabricate the cylinder block. At the same time David Elliott is building up the scale 3D printed model to determine the best construction sequence to ensure that all seams can be fully welded. The intention was to issue a “request for expressions of interest” to a number of fabricators during December. The target is for an almost full set of manufacturing drawings at the end of January to enable shortlisted companies to quote for the whole job.

The latest cylinder CADs and the assembled scale model of the cylinder block. – David Elliott

In parallel with discussions are at an advanced stage with a specialist company in CFD (computational fluid dynamics) to model the steam flow through the cylinder block to ensure that we do not have avoidable pressure reducing features to enable us to optimize the detail of the design – there is little scope for significant redesign of the block as the steam and exhaust passages are already as large as practical within the tight limits of the envelope of the block, however some gains may be possible through increasing radii on the inner corner of bends etc.

It is expected that this work will lead on to a more extensive model to analyse steam flow from the regulator to the blast pipe which will assist in fine tuning the profiles of the cams and the diameter of the blast pipe tops.

A further use of CFD will be look at smoke lifting. The original P2 No. 2001 Cock o’ the North did not have smoke lifting issues as even at low powers, as students of the history of the P2s will be aware, but the second engine, No. 2002 Earl Marischal (as first built with Walschaerts valve gear and the same smoke box and smoke lifting plates as No. 2001), immediately suffered from drifting smoke affecting the driver’s view resulting in early fitment of large and rather ugly smoke deflectors. The main difference is that piston valves open and close the exhaust valves gradually, with very little cross section for gas flow at the start and end of each event resulting in the exhaust appearing to “leak” from the chimney encouraging it to stick to the boiler top, which with the cross winds and the Coanda effect draws the exhaust down on the leeward side of the boiler. By contrast, poppet valves open and close to full area quickly resulting in sharper edged exhaust beats. Whilst not a problem on No. 2001, with all the computer modelling to optimize efficiency and power, there is a risk that the “squareness” of 2007’s exhaust beats may end up less sharp. If a smoke lifting problem is identified it is anticipated that with 80+ years of aerodynamic development since No. 2002 appeared, some relatively unobtrusive aerodynamic fences or strakes could be applied to solve the problem.

A short-term lack of Solidworks drafting capability has been identified and steps are in hand to recruit addition resources to cover this to expedite production of the detailed drawings for the valve gear. Low risk items such as reversing gear, return crank gear boxes and cardan shafts, and casting and machining valve covers can then be put into manufacture. In parallel it is intended to prototype a cam/follower/tappet/valve assembly and subject it to some fatigue testing before committing to a full set.

3D CAD view of poppet exhaust valve. – David Elliott

Cylinder drain cocks – Considerable progress has been made (mainly by Ian Matthews) in installing Alan Parkin’s cylinder drain cock design onto the frames. The design is closely based on that on Tornado to eliminate the use of Bowden cables (as used on the original P2s).

Cylinder drain cock actuating linkages. – Ian Matthews

  • Building a new class P2
  • Design Study
  • Construction
  • P2 Progress

Construction Archives

  • April 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • March 2019
  • December 2018
  • October 2018
  • September 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • July 2016
  • June 2016
  • April 2016
  • March 2016
  • February 2016
  • December 2015
  • November 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • March 2015
  • February 2015
  • September 2014
  • July 2014
  • May 2014
  • April 2014
  • February 2014

Latest News

  • Tender construction continues
  • Boiler(s) update
  • Suppliers sought for cylinder block for No. 2007 Prince of Wales
  • Pony truck delivered
  • New railway art unveiled in Darlington

Log in

Make a donation

Contact

The P2 Steam Locomotive Company
Darlington Locomotive Works
Hopetown Lane
Darlington
DL3 6RQ

01325 460163

Darlington Locomotive Works – The Works are open to the public on the first and third Saturday of each month, the latter a day that coincides with NELPG also opening their doors to visitors – 11:00hrs to 16:00hrs. NOTE, DUE TO THE CURRENT SITUATION, THE WORKS ARE CLOSED UNTIL FURTHER NOTICE.

Social Media

  • The P2 Steam Locomotive Company
  • @Gresley_P2_2007

Twitter

Gresley P2 2007Follow

Avatar
Gresley P2 2007@Gresley_P2_2007·
16 Apr

THREE-QUARTERS OF THE WAY THERE - HELP US TO RAISE A HEAD OF STEAM AND JOIN THE BOILER CLUB TODAY!

So far, The Boiler Club has received pledges of £450,000 (excluding Gift Aid) from 225 supporters - 75% of the 300 needed!

Click here to sign up online: http://ow.ly/ELR950Endyj

Reply on Twitter 1382992174632083457Retweet on Twitter 138299217463208345713Like on Twitter 138299217463208345736Twitter 1382992174632083457
Gresley P2 2007@Gresley_P2_2007·
11 Apr

Did you know that you can now sign up as a P2 Covenantor, join any of the P2 clubs, contribute to The P2 Support Coach Appeal or make one off donations online ?

Click here to sign up today: http://ow.ly/GH8m50DJECp

Reply on Twitter 1381170228915224576Retweet on Twitter 13811702289152245763Like on Twitter 138117022891522457620Twitter 1381170228915224576
Gresley P2 2007@Gresley_P2_2007·
9 Apr

The A1SLT wish to extend our deepest sympathies to Her Majesty The Queen, His Royal Highness The Prince of Wales and the whole Royal Family following the very sad news of the death of His Royal Highness The Prince Philip, Duke of Edinburgh.

http://ow.ly/p9Oo50EkD4h

Reply on Twitter 1380509567914762247Retweet on Twitter 13805095679147622472Like on Twitter 138050956791476224719Twitter 1380509567914762247

© 2021 The P2 Steam Locomotive Company Limited. Registered in England no. 08549849.