• No. 60163 Tornado
  • No. 2007 Prince of Wales
  • No. 3403 V4 Project
  • Facebook
  • Twitter
  • Home
  • About the P2 Project
    • The Team
    • Darlington Locomotive Works
    • Virtual 3D Tour of DLW
  • History
    • History of the Gresley class P2s
    • Nigel Gresley
    • Original P2s
  • Building a new class P2
    • Design Study
    • Construction
    • P2 Progress
  • Supporting No. 2007
    • Become a regular donor/covenantor
    • Join The Boiler Club
    • Join The Motion Club
    • Join The Tender Club
    • Join The Turbogen Club
    • Subscribe to The P2 Support Coach Appeal
    • Sponsor a component
    • The Pony Truck Club – Complete!
    • The Cylinder Club – Complete!
    • The Mikado Club – Complete!
    • The Founders Club – Complete!
    • Volunteering
    • Establish a Legacy
  • News
    • News
    • Mikado Messenger
    • The Communication Cord
  • Events
  • Facebook
  • Twitter
  • No. 60163 Tornado
  • No. 3403 V4 Project

Construction

Cylinder and valve gear development

12/09/202012/09/2020

Whilst Alan Parkin has been developing manufacturing drawings for the cylinder block, David Elliott has resolved one of the more tricky design issues with the poppet valve gear. One of the unsatisfactory features of the original No. 2001 cylinder block was having the inlet and exhaust valves on opposite sides of the middle cylinder. As a result, separate ports were required from the cylinder to the valve chests which gave rise to excessive clearance volume. Clearance volume is the space in the cylinder and its associated ports that is left when the piston is at the end of its stroke and is usually expressed as a percentage of the total volume for the cylinder when the piston is at the other end of its stroke. This space is not good for efficiency as for each power stroke of the piston, the clearance volume has to be filled with steam which does little work on the piston. The best figures achieved with poppet valves are around 10%. The original P2 design middle cylinder had clearance volumes of around 14% at one end and 16% at the other – the difference being due to the slope of the cylinder in the block to enable the connecting rod to clear the leading coupled axle whilst the valves were almost horizontal to be in line with those on the outside cylinders.

 

No. 2001 cylinder section drawing showing the clearance volume – LNER/David Elliott

To overcome this problem, the layout of the valves has been changed to mimic the outside cylinders with the inlet and exhaust valves together and in line with the centerline of the cylinder. This does create a challenge, as whilst the exhaust valves can be driven directly from the Driver’s side cambox (as on No. 2001), the inlet valves are on the other side of the engine compared with the cam driving them. After several iterations a pair of rocking shafts have been designed to transfer the movement of the inlet valve cam tappets on the Fireman’s side of the engine across to the inside cylinder inlet valves.

No. 2007 cylinder section drawing showing the clearance volume – David Elliott

Cylinder block section showing rocking shaft drive to inside cylinder inlet valve – David Elliott

3D printing – David Elliott has recently acquired a 3D printer.  The first work undertaken is to reproduce all the individual parts of the cylinder block at 1:8 scale to ensure that the proposed weld sequence will actually work with sufficient access to achieve all the welds. It will also help prospective fabricators to understand the design when quotes are sought.

1:8 scale 3D printed cylinder parts – David Elliott

Shortly after the printer was first set to work, we were sorting out patterns for the regulator stuffing box that is needed to test the new boilers in Meiningen and were reminded that the cover pattern was missing. The 3D model was rapidly modified to include machining allowances and add “draft” to the edges and a pattern printed. This took the printer about 56 hours altogether – fortunately, provided it does not run out of plastic filament or suffer loss of power, it happily proceeds on its own until finished!

3D printing of regulator stuffing box cover – David Elliott

The printed patterns for the stuffing box – David Elliott

  • Building a new class P2
  • Design Study
  • Construction
  • P2 Progress

Construction Archives

  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • March 2019
  • December 2018
  • October 2018
  • September 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • July 2016
  • June 2016
  • April 2016
  • March 2016
  • February 2016
  • December 2015
  • November 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • March 2015
  • February 2015
  • September 2014
  • July 2014
  • May 2014
  • April 2014
  • February 2014

Latest News

  • P2 locomotive and tender frame progress.
  • Cylinder block update.
  • Christmas lights! An electrical update for the new P2.
  • Christmas gifts forged from steel.
  • Boiler No.1 (or is it No.2?) nears completion.

Log in

Make a donation

Contact

The P2 Steam Locomotive Company
Darlington Locomotive Works
Hopetown Lane
Darlington
DL3 6RQ

01325 460163

Darlington Locomotive Works – The Works are open to the public on the first and third Saturday of each month, the latter a day that coincides with NELPG also opening their doors to visitors – 11:00hrs to 16:00hrs. NOTE, DUE TO THE CURRENT SITUATION, THE WORKS ARE CLOSED UNTIL FURTHER NOTICE.

Social Media

  • The P2 Steam Locomotive Company
  • @Gresley_P2_2007

Twitter

Gresley P2 2007Follow

Avatar
Gresley P2 2007@Gresley_P2_2007·
12h

We need your 'Support' !

Have you thought about supporting us ? Join the Support Coach Appeal today.

Click here for more information: https://www.p2steam.com/support/support-coach-appeal/#/

Reply on Twitter 1365281730677133316Retweet on Twitter 136528173067713331611Like on Twitter 136528173067713331619Twitter 1365281730677133316
Gresley P2 2007@Gresley_P2_2007·
22 Feb

7 years ago today, we had the pleasure of working with TV presenter, James May at Darlington Locomotive Works to make the first component (the smokebox door dart) of P2 No.2007 Prince of Wales.

Click here to find out how he did it: https://www.p2steam.com/2014/02/23/james-may-makes-first-component-for-no-2007/

📸Credit:A1SLT

Reply on Twitter 1363851133035364358Retweet on Twitter 13638511330353643584Like on Twitter 136385113303536435838Twitter 1363851133035364358
Gresley P2 2007@Gresley_P2_2007·
18 Feb

The Very Best of British Engineering

David Champion, President of The A1 Steam Locomotive Trust , and Steve Davies MBE, Chairman, would like to invite you to their talk which is being hosted by The Leaders Club.

Click here to register: http://ow.ly/c2RZ50DDD85

2
Reply on Twitter 1362424177744084999Retweet on Twitter 13624241777440849996Like on Twitter 136242417774408499938Twitter 1362424177744084999

© 2021 The P2 Steam Locomotive Company Limited. Registered in England no. 08549849.