• No. 60163 Tornado
  • No. 2007 Prince of Wales
  • No. 3403 V4 Project
  • Facebook
  • Twitter
  • Home
  • About the P2 Project
    • The Team
    • Darlington Locomotive Works
    • Virtual 3D Tour of DLW
  • History
    • History of the Gresley class P2s
    • Nigel Gresley
    • Original P2s
  • Building a new class P2
    • Design Study
    • Construction
    • P2 Progress
  • Supporting No. 2007
    • Become a regular donor/covenantor
    • Join The Boiler Club
    • Join The Motion Club
    • Join The Tender Club
    • Join The Turbogen Club
    • Subscribe to The P2 Support Coach Appeal
    • Sponsor a component
    • The Pony Truck Club – Complete!
    • The Cylinder Club – Complete!
    • The Mikado Club – Complete!
    • The Founders Club – Complete!
    • Volunteering
    • Establish a Legacy
  • News
    • News
    • Mikado Messenger
    • The Communication Cord
  • Events
  • Facebook
  • Twitter
  • No. 60163 Tornado
  • No. 3403 V4 Project

Construction

Early September update

05/09/201905/09/2019

As ever, a lot of small jobs need to be done to keep the larger work online so here a few photos by Daniela Filová of work in progress at Darlington Locomotive Works:

Terry Graham and James Heginbottom drilling BR1 brake blocks.

Steve Wood performing an hydraulic test on the cylinder drain cock castings prior to machining.

Ian Matthews machining off weld on the handrail end.

The left hand Slide bar bracket ready to be inspected.

Tender construction special!

04/09/2019

The tender base plate has been advanced to the point where it has been delivered to Crofton for Ian Howitt to pre-fit to the frames. It should be there for a fortnight after which it will return to North View to have the tank built up on it. Find out how to join The Tender Club here.

The tender frames start to come together at Ian Howitt’s Crofton Works – Nigel Facer

Although conditions are cramped Ian Howitt managed to build Tornado’s tender in the same space – Nigel Facer

Details of the spring hangers and tender tank brackets – Nigel Facer

Brake components ready for fitting to the tender chassis – Nigel Facer

The tender tank base plate at North View Engineering – Daniela Filova

One of the splashers built-in to the base plate – Daniela Filova

With the sump fabricated (in the space occupied by the water-scoop on No. 2001’s tender) the base plate was delivered to Crofton for trial-fitting to the frames at Ian Howitt’s works – Daniela Filova

  • Building a new class P2
  • Design Study
  • Construction
  • P2 Progress

Construction Archives

  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • March 2019
  • December 2018
  • October 2018
  • September 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • July 2016
  • June 2016
  • April 2016
  • March 2016
  • February 2016
  • December 2015
  • November 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • March 2015
  • February 2015
  • September 2014
  • July 2014
  • May 2014
  • April 2014
  • February 2014

Latest News

  • P2 locomotive and tender frame progress.
  • Cylinder block update.
  • Christmas lights! An electrical update for the new P2.
  • Christmas gifts forged from steel.
  • Boiler No.1 (or is it No.2?) nears completion.

Log in

Make a donation

Contact

The P2 Steam Locomotive Company
Darlington Locomotive Works
Hopetown Lane
Darlington
DL3 6RQ

01325 460163

Darlington Locomotive Works – The Works are open to the public on the first and third Saturday of each month, the latter a day that coincides with NELPG also opening their doors to visitors – 11:00hrs to 16:00hrs. NOTE, DUE TO THE CURRENT SITUATION, THE WORKS ARE CLOSED UNTIL FURTHER NOTICE.

Social Media

  • The P2 Steam Locomotive Company
  • @Gresley_P2_2007

Twitter

Gresley P2 2007Follow

Avatar
Gresley P2 2007@Gresley_P2_2007·
1 Mar

60 by 60 !

We now have 940 covenantors, and we still hope to reach 1000 by the end of July. Help us gain the final 60 by the 60th anniversary of the scrapping of the last P2s.

Click here for more info: http://ow.ly/S7K750DMvSF
📸Credit: A1SLT

Reply on Twitter 1366376441429000192Retweet on Twitter 136637644142900019222Like on Twitter 136637644142900019273Twitter 1366376441429000192
Gresley P2 2007@Gresley_P2_2007·
28 Feb

We are excited to announce that the online donations system is now available on our website for signing up as a P2 Covenantor, joining any of the P2 clubs, contributing to The P2 Support Coach Appeal or making one off donations.

Click here to sign up: http://ow.ly/l14U50DJECo

Reply on Twitter 1366161351316549636Retweet on Twitter 13661613513165496365Like on Twitter 136616135131654963631Twitter 1366161351316549636
Gresley P2 2007@Gresley_P2_2007·
26 Feb

We need your 'Support' !

Have you thought about supporting us ? Join the Support Coach Appeal today.

Click here for more information: https://www.p2steam.com/support/support-coach-appeal/#/

Reply on Twitter 1365281730677133316Retweet on Twitter 136528173067713331611Like on Twitter 136528173067713331623Twitter 1365281730677133316

© 2021 The P2 Steam Locomotive Company Limited. Registered in England no. 08549849.