• No. 60163 Tornado
  • No. 2007 Prince of Wales
  • No. 3403 V4 Project
  • Facebook
  • Twitter
  • Home
  • About the P2 Project
    • The Team
    • Darlington Locomotive Works
    • Virtual 3D Tour of DLW
  • History
    • History of the Gresley class P2s
    • Nigel Gresley
    • Original P2s
  • Building a new class P2
    • Design Study
    • Construction
    • P2 Progress
  • Supporting No. 2007
    • Become a regular donor/covenantor
    • Join The Boiler Club
    • Join The Motion Club
    • Join The Tender Club
    • Join The Turbogen Club
    • Subscribe to The P2 Support Coach Appeal
    • Sponsor a component
    • The Pony Truck Club – Complete!
    • The Cylinder Club – Complete!
    • The Mikado Club – Complete!
    • The Founders Club – Complete!
    • Volunteering
    • Establish a Legacy
  • News
    • News
    • Mikado Messenger
    • The Communication Cord
  • Events
  • Facebook
  • Twitter
  • No. 60163 Tornado
  • No. 3403 V4 Project

Construction

Late June construction update

26/06/2019

The new 1” BSW x 2” long nuts for the Superheater header ‘T’ bolts have arrived and passed inspection.  The ‘T’ bolts themselves aren’t expected for another few weeks – when they arrive, we will be able to carry out the hydraulic test on the header.

The new patterns for the locomotive and tender spring boxes have also arrived.  We’ve also been preparing a number of items for shot blasting – the new cab seat cubicles, the driving wheel balance weights plates, and the guard irons.

Our volunteers have turned their attention to polishing the tyres on the driving wheels.  The photo below shows the mirror finish achieved on the left leading driving wheel.

All photos by Richard Pearson

June construction update

04/06/2019

General – We have reached that period in the project where there is a lot of essential but relatively unspectacular work going on including pipework and electrics, brake gear details and fittings. Having said that, the tender tank has been ordered and we are on the cusp of ordering the boiler.

Frames – We have at last received the first of the two outside motion brackets and following inspection, these will be fitted to the frames.

The last of the frame components in the form of the remaining 10 spring hanger brackets have been ordered from North View Engineering Solutions. The original designs used steel castings, however as they are all handed and are mostly different from one another, the pattern costs would be considerable. On first look they are similar to those on Tornado, but on closer examination and resulting in part from the difference in coupled wheel sizes, they are longer from top to bottom than the A1 type, preventing use of the Tornado patterns. They have all been redesigned as welded fabrications and the two pairs which are joined together across the frames – on the P2 by bolting a heavy section angle irons between them, have been replaced by the significantly stronger one-piece design employed on the A1 class.

Two of the spring brackets have bearing housings attached to the back of them to support the brake lever shaft for the rear pair of coupled wheels. As we have modified the design of the brake lever from vacuum to air operation which has slightly altered the distribution of forces in the brake lever shaft, the spring hanger brackets with brake shaft bearings have been subjected to Finite Element Analysis (FEA) by Daniela, which after a subtle improvement to some weld profiles, have been shown to have an adequate margin of strength and fatigue resistance.

The fitting of the motion brackets and spring hangers will complete the engine frame structure.

Wheelsets – After further protracted delays, the pony truck cannonbox is back with Timson Engineering at Kettering for final machining following replacement of some of the manganese steel wear plates. Delivery to Darlington is eagerly anticipated.

Our volunteers are making good progress with polishing the tyre rims.

The speedo drive return crank (which doubles as the crank pin nut on the LH trailing coupled wheel) has been delivered and is presently being fettled and polished by our volunteers.

Boiler – The draft of the updated boiler design has been received and “best and final” updates for quotes for the boiler sought. By the time this article appears in TCC, we expect the decision on supplier will have been made and contract negotiations to be well in hand.

Major boiler fittings – Preparations are being made to carry out the hydraulic test on the superheater header (including finding the 86 rubber dog balls required to block the superheater element connection holes).

Cylinders – Further detailed design work has been done on the cylinder block and valve gear in anticipation of commencement of manufacture. In the meantime Alan Parkin has produced drawings and quotations for valve cover patterns have been sought.

Brake rigging – four fabricated brake cross stays (similar to those made for Tornado) have been delivered by North View Engineering Solutions.

The front and rear short brake links have been completed, the latter being a complicated offset design which have been machined from solid at Darlington Locomotive Works. Brake blocks have been ordered and all the brake pins made. We are expecting delivery of the two brake lever shafts from I D Howitt at Crofton shortly.

Cab – With Daniela having completed the drawings, material has been delivered and cab seats and cab seat cubicles are under construction.

Tender – The order for the tender tank has been placed with North View Engineering Solutions. Delivery of the base plate to Ian Howitt at Crofton is scheduled for pre-fitting to the frames during June, with the completed tank delivered to Darlington Locomotive Works in September, by which time we expect to have the frames on site.

Ian Howitt continues to make good progress with the tender frames with the spring hanger and tank brackets attached to the frame plates. Major components have been made including the drag boxes.

We are still awaiting delivery of the remaining tender axle, with a current promise for mid-June. At that stage the four axles will be dispatched along with the wheels to South Devon Railway Engineering.

Fittings – Our first attempt to appoint a machinist was not successful, so we have re-advertised the job. In mean time urgent fittings and machining work is being subcontracted out.

Efforts are being made to secure the loan of patterns from the 71000 Duke of Gloucester team for the Davies and Metcalfe class K exhaust injector. Manufacturers are also being sought for the grease separator which is located in the exhaust steam pipe to prevent oil and grease from the exhaust steam being injected into the boiler.

Pipework – The critical path on project plan is pipework, so effort has been concentrated on design and installation of the major pipe runs.

The first to have been made is the exhaust steam injector exhaust steam pipe – a 4in bore pipe which carries exhaust steam from the cylinder block all the way back to the exhaust steam injector under the cab; being the largest pipe we have to accommodate it was routed and made first with Ian Matthews fabricating it. It has been trial installed but each of the sections will require hydraulic testing before permanent installation. This pipe also serves as the exhaust pipe for the two air pumps.

The next pipe run will be the 2in vacuum pipe including the DV2 air/vacuum proportional valve.

Design is well in hand for the air brake and air reservoir pipes which also run the full length of the frames.

Electrical – The casing for the new belt driven alternator prototype has been fabricated by North Bay Railway Engineering in Darlington and has been christened “Noo Noo” due to its similarity in appearance to the vacuum cleaner in the Teletubbies!  Meanwhile Alan is seeking quotes for the remaining detail components.

Alan has made very good progress with routing the stainless steel electrical trunking and conduits through the frames. He has also worked up a design for a slightly enlarged battery box which will permit fitting of batteries of greater capacity than those on Tornado to provide greater margins for when the ERTMS cab signaling system eventually has to be fitted to the locomotive. The new battery boxes look very similar to the BR AWS (Automatic Warning System) battery boxes fitted to Tornado which is somewhat anomalous as P2s were never fitted with AWS!. However, we do not have enough space to locate the batteries anywhere else so have adopted the same location as Tornado. The BR design is not very conspicuous and had the P2s survived into original form into the 1950s, they would have been fitted with AWS.

One change we are making from Tornado design is the means of disconnecting cables between the cab and frame so that the cab can be removed from the engine – which is often needed for firebox repairs. On Tornado, the cables from the frames pass through holes in the footplate and the bottom of the brake equipment cubicle in the cab floor and plug directly into the equipment in the under-seat cubicles. The process of disconnecting these requires great care and leaves the cables with their connectors hanging from the trunking above the battery boxes where they are vulnerable. The chosen solution is to set military standard plug sockets in recessed boxes in the underside of the cab base which enable short cables to be plugged in directly. When the cab is removed, the plug sockets have dummy covers fitted and the cables and plugs (which are much shorter) can be coiled up and stowed in the trunking above the battery boxes.

A further electrical design review has been conducted with Rob Morland, Alan Parkin and David Elliott to assess the design work to date and decide if any changes were needed. Fortunately, very little alteration was felt to be required, and Alan is clear to proceed under Rob’s direction to complete the detail design of the trunking installation.

  • Building a new class P2
  • Design Study
  • Construction
  • P2 Progress

Construction Archives

  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • March 2019
  • December 2018
  • October 2018
  • September 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • July 2016
  • June 2016
  • April 2016
  • March 2016
  • February 2016
  • December 2015
  • November 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • March 2015
  • February 2015
  • September 2014
  • July 2014
  • May 2014
  • April 2014
  • February 2014

Latest News

  • P2 locomotive and tender frame progress.
  • Cylinder block update.
  • Christmas lights! An electrical update for the new P2.
  • Christmas gifts forged from steel.
  • Boiler No.1 (or is it No.2?) nears completion.

Log in

Make a donation

Contact

The P2 Steam Locomotive Company
Darlington Locomotive Works
Hopetown Lane
Darlington
DL3 6RQ

01325 460163

Darlington Locomotive Works – The Works are open to the public on the first and third Saturday of each month, the latter a day that coincides with NELPG also opening their doors to visitors – 11:00hrs to 16:00hrs. NOTE, DUE TO THE CURRENT SITUATION, THE WORKS ARE CLOSED UNTIL FURTHER NOTICE.

Social Media

  • The P2 Steam Locomotive Company
  • @Gresley_P2_2007

Twitter

Gresley P2 2007Follow

Avatar
Gresley P2 2007@Gresley_P2_2007·
1 Mar

60 by 60 !

We now have 940 covenantors, and we still hope to reach 1000 by the end of July. Help us gain the final 60 by the 60th anniversary of the scrapping of the last P2s.

Click here for more info: http://ow.ly/S7K750DMvSF
📸Credit: A1SLT

Reply on Twitter 1366376441429000192Retweet on Twitter 136637644142900019222Like on Twitter 136637644142900019272Twitter 1366376441429000192
Gresley P2 2007@Gresley_P2_2007·
28 Feb

We are excited to announce that the online donations system is now available on our website for signing up as a P2 Covenantor, joining any of the P2 clubs, contributing to The P2 Support Coach Appeal or making one off donations.

Click here to sign up: http://ow.ly/l14U50DJECo

Reply on Twitter 1366161351316549636Retweet on Twitter 13661613513165496365Like on Twitter 136616135131654963631Twitter 1366161351316549636
Gresley P2 2007@Gresley_P2_2007·
26 Feb

We need your 'Support' !

Have you thought about supporting us ? Join the Support Coach Appeal today.

Click here for more information: https://www.p2steam.com/support/support-coach-appeal/#/

Reply on Twitter 1365281730677133316Retweet on Twitter 136528173067713331611Like on Twitter 136528173067713331622Twitter 1365281730677133316

© 2021 The P2 Steam Locomotive Company Limited. Registered in England no. 08549849.