• No. 60163 Tornado
  • No. 2007 Prince of Wales
  • No. 3403 V4 Project
  • Facebook
  • Twitter
  • Home
  • About the P2 Project
    • The Team
    • Darlington Locomotive Works
    • Virtual 3D Tour of DLW
  • History
    • History of the Gresley class P2s
    • Nigel Gresley
    • Original P2s
  • Building a new class P2
    • Design Study
    • Construction
    • P2 Progress
  • Supporting No. 2007
    • Become a regular donor/covenantor
    • Join The Boiler Club
    • Join The Motion Club
    • Join The Tender Club
    • Join The Turbogen Club
    • Subscribe to The P2 Support Coach Appeal
    • Sponsor a component
    • The Pony Truck Club – Complete!
    • The Cylinder Club – Complete!
    • The Mikado Club – Complete!
    • The Founders Club – Complete!
    • Volunteering
    • Establish a Legacy
  • News
    • News
    • Mikado Messenger
    • The Communication Cord
  • Events
  • Facebook
  • Twitter
  • No. 60163 Tornado
  • No. 3403 V4 Project

Construction

Construction compilation

26/04/201622/07/2016

Progress continues on many fronts, these images show a lot of effort being put into the frame stays, cab and sundry small parts.  All photos by David Elliott.

04191602 David Elliott

Cab beads temporarily bolted together – finished (above left), before machining (below right)

04191614 David Elliott

Steve Wood machining the cab beading

04191604 David Elliott

Cab roof components primed

04191605 David Elliott

Cartazzi hornblocks permanently installed

04191607 David Elliott

Exhaust injector control valve casting being machined at M Machine

04191611 David Elliott

Machined kit of parts for front bufferbeam draw hook spring block

04191608 David Elliott

Front drawhook spring block as fabrication

04191609 David Elliott

Inside motion bracket ready for machining

04191610 David Elliott

Intermediate frame stay ready for machining at North View

04191613 David Elliott

Rear frame stay nearing completion of welding at North View

04191615 David Elliott

Temporary smokebox saddle stay

Further machining work….

18/04/201622/07/2016

Even when no large and impressive parts feature in our news, work continues at Darlington Locomotive Works to machine and fit many of those that have been cast or manufactured.  In these photos by Bob Hughes Ian Matthews is seen machining part of the front drawbar spring block which was originally a casting and has been re-designed as a steel fabrication.

04121601 Bob Hughes

04121602 Bob Hughes

04121603 Bob Hughes

04121604 Bob Hughes

Profiles for the smoke box door hinges, hinge brackets and the door centre boss

04121605 Bob Hughes

The kit of parts to make a temporary stay to fit where the cylinders will eventually go. This needed to keep the front frames straight to enable completion of the front footplating and also to act as a temporary support for the smokebox pending the cylinder block being fitted.

 

  • Building a new class P2
  • Design Study
  • Construction
  • P2 Progress

Construction Archives

  • April 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • March 2019
  • December 2018
  • October 2018
  • September 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • July 2016
  • June 2016
  • April 2016
  • March 2016
  • February 2016
  • December 2015
  • November 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • March 2015
  • February 2015
  • September 2014
  • July 2014
  • May 2014
  • April 2014
  • February 2014

Latest News

  • Tender construction continues
  • Boiler(s) update
  • Suppliers sought for cylinder block for No. 2007 Prince of Wales
  • Pony truck delivered
  • New railway art unveiled in Darlington

Log in

Make a donation

Contact

The P2 Steam Locomotive Company
Darlington Locomotive Works
Hopetown Lane
Darlington
DL3 6RQ

01325 460163

Darlington Locomotive Works – The Works are open to the public on the first and third Saturday of each month, the latter a day that coincides with NELPG also opening their doors to visitors – 11:00hrs to 16:00hrs. NOTE, DUE TO THE CURRENT SITUATION, THE WORKS ARE CLOSED UNTIL FURTHER NOTICE.

Social Media

  • The P2 Steam Locomotive Company
  • @Gresley_P2_2007

Twitter

Gresley P2 2007Follow

Avatar
Gresley P2 2007@Gresley_P2_2007·
16 Apr

THREE-QUARTERS OF THE WAY THERE - HELP US TO RAISE A HEAD OF STEAM AND JOIN THE BOILER CLUB TODAY!

So far, The Boiler Club has received pledges of £450,000 (excluding Gift Aid) from 225 supporters - 75% of the 300 needed!

Click here to sign up online: http://ow.ly/ELR950Endyj

Reply on Twitter 1382992174632083457Retweet on Twitter 138299217463208345713Like on Twitter 138299217463208345736Twitter 1382992174632083457
Gresley P2 2007@Gresley_P2_2007·
11 Apr

Did you know that you can now sign up as a P2 Covenantor, join any of the P2 clubs, contribute to The P2 Support Coach Appeal or make one off donations online ?

Click here to sign up today: http://ow.ly/GH8m50DJECp

Reply on Twitter 1381170228915224576Retweet on Twitter 13811702289152245763Like on Twitter 138117022891522457620Twitter 1381170228915224576
Gresley P2 2007@Gresley_P2_2007·
9 Apr

The A1SLT wish to extend our deepest sympathies to Her Majesty The Queen, His Royal Highness The Prince of Wales and the whole Royal Family following the very sad news of the death of His Royal Highness The Prince Philip, Duke of Edinburgh.

http://ow.ly/p9Oo50EkD4h

Reply on Twitter 1380509567914762247Retweet on Twitter 13805095679147622472Like on Twitter 138050956791476224719Twitter 1380509567914762247

© 2021 The P2 Steam Locomotive Company Limited. Registered in England no. 08549849.