• No. 60163 Tornado
  • No. 2007 Prince of Wales
  • No. 3403 V4 Project
  • Facebook
  • Twitter
  • Home
  • About the P2 Project
    • The Team
    • Darlington Locomotive Works
    • Virtual 3D Tour of DLW
  • History
    • History of the Gresley class P2s
    • Nigel Gresley
    • Original P2s
  • Building a new class P2
    • Design Study
    • Construction
    • P2 Progress
  • Supporting No. 2007
    • Become a regular donor/covenantor
    • Join The Boiler Club
    • Join The Motion Club
    • Join The Tender Club
    • Join The Turbogen Club
    • Subscribe to The P2 Support Coach Appeal
    • Sponsor a component
    • The Pony Truck Club – Complete!
    • The Cylinder Club – Complete!
    • The Mikado Club – Complete!
    • The Founders Club – Complete!
    • Volunteering
    • Establish a Legacy
  • News
    • News
    • Mikado Messenger
    • The Communication Cord
  • Events
  • Facebook
  • Twitter
  • No. 60163 Tornado
  • No. 3403 V4 Project

Construction

A riveting time at Darlington!

25/09/2014
In common with Tornado, Prince of Wales will not have many rivets in its structure, the majority of assembly is by driven bolts, where a machined bolt is made very slightly bigger than the hole it fits in and is driven in, either using a hydraulic jack, or if not practicable, a large copper mallet. A self locking nut is then fitted. This way the bolts act as dowels and are very resistant to shear forces which tend to be the predominant loads in locomotive frames. The nuts provide a strong clamping force as well. The resultant joint is very predictable in terms of forces and quality.
 
In the original construction two types of rivet were used:
 
1) hot rivets where the hole the rivet is fitted into is typically 1/16″ larger than the rivet, to allow the white hot rivet to be easily inserted. The rivet is then turned over by a pneumatic rivet gun to form the desired rivet head – typically countersunk if the finished rivet is to be flush with the surface, or snap head which produces the classic hemispherical rivet head. As the rivet cools it pulls the two plates very tightly together, however it is not particularly good in shear as the rivet is a loose fit in the hole.
 
2) cold turned rivets  – these were used where heavy shear forces are encountered, for example on spring hanger brackets. In this case as per driven bolts they are made to be an interference fit in the holes but are inserted cold. The protruding end is then heated to white heat and the head formed as per hot rivets. Whilst they react well in shear, it is not possible to achieve high clamping forces.
 
When applied on a large scale, rivets are cheaper and quicker to make and fit than bolts, however the less predictable joint strength and the lack of highly skilled riveters makes the bolt solution more attractive today.
09151401Warming up rivetsDE
 
Ian Matthews heats up a rivet prior to fitting – David Elliott
 
09151402Rivet in holeDE
 
Mick Robinson inserts the rivet – David Elliott
 
09151403Hammering over rivetDE
 
Reg Rossiter supports the jack as Mick applies the rivet gun – David Elliott
 
The only places where we are retaining rivets is in areas where the bolt heads and nuts would be in the way of other equipment. The frame doubler plates under the front of the firebox are just such an area, where a number of pipes have to be routed along the inside of the frames past the ash pan. Thus we have used rivets with a snap head on one end a countersink head on the other. The photos show the countersunk heads extending proud of the plates, these will be ground back flush as necessary to clear the pipework.  Mick Robinson has experience with using large pneumatic rivet guns so we have done the work “in house” with assistance from Ian Matthews who when not painting engines (including Tornado) does a lot of riveting on 1/8th and 1/12th scale models, and volunteer Reg Rossiter whose background is ship and oil rig engineering, so is used to big pieces of metal. Thanks are due to M Machine for the loan of their diesel compressor and to Rail Restorations North East for the loan of the rivet gun
  • Building a new class P2
  • Design Study
  • Construction
  • P2 Progress

Construction Archives

  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • March 2019
  • December 2018
  • October 2018
  • September 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • July 2016
  • June 2016
  • April 2016
  • March 2016
  • February 2016
  • December 2015
  • November 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • March 2015
  • February 2015
  • September 2014
  • July 2014
  • May 2014
  • April 2014
  • February 2014

Latest News

  • P2 locomotive and tender frame progress.
  • Cylinder block update.
  • Christmas lights! An electrical update for the new P2.
  • Christmas gifts forged from steel.
  • Boiler No.1 (or is it No.2?) nears completion.

Log in

Make a donation

Contact

The P2 Steam Locomotive Company
Darlington Locomotive Works
Hopetown Lane
Darlington
DL3 6RQ

01325 460163

Darlington Locomotive Works – The Works are open to the public on the first and third Saturday of each month, the latter a day that coincides with NELPG also opening their doors to visitors – 11:00hrs to 16:00hrs. NOTE, DUE TO THE CURRENT SITUATION, THE WORKS ARE CLOSED UNTIL FURTHER NOTICE.

Social Media

  • The P2 Steam Locomotive Company
  • @Gresley_P2_2007

Twitter

Gresley P2 2007Follow

Avatar
Gresley P2 2007@Gresley_P2_2007·
11h

We need your 'Support' !

Have you thought about supporting us ? Join the Support Coach Appeal today.

Click here for more information: https://www.p2steam.com/support/support-coach-appeal/#/

Reply on Twitter 1365281730677133316Retweet on Twitter 136528173067713331611Like on Twitter 136528173067713331619Twitter 1365281730677133316
Gresley P2 2007@Gresley_P2_2007·
22 Feb

7 years ago today, we had the pleasure of working with TV presenter, James May at Darlington Locomotive Works to make the first component (the smokebox door dart) of P2 No.2007 Prince of Wales.

Click here to find out how he did it: https://www.p2steam.com/2014/02/23/james-may-makes-first-component-for-no-2007/

📸Credit:A1SLT

Reply on Twitter 1363851133035364358Retweet on Twitter 13638511330353643584Like on Twitter 136385113303536435838Twitter 1363851133035364358
Gresley P2 2007@Gresley_P2_2007·
18 Feb

The Very Best of British Engineering

David Champion, President of The A1 Steam Locomotive Trust , and Steve Davies MBE, Chairman, would like to invite you to their talk which is being hosted by The Leaders Club.

Click here to register: http://ow.ly/c2RZ50DDD85

2
Reply on Twitter 1362424177744084999Retweet on Twitter 13624241777440849996Like on Twitter 136242417774408499938Twitter 1362424177744084999

© 2021 The P2 Steam Locomotive Company Limited. Registered in England no. 08549849.