07101401Prestons arriveDE

Prestons arrive with the frames from Boro’ Foundry – David Elliott

07101403Frames arrive in DLW-DE

The wagon is carefully backed into Darlington Locomotive Works – David Elliott

07101404Front frames craned offDE

The smaller front frames are craned off – David Elliott

07101405Main frame plate being craned off 10-7-14

The main frames then follow – David Elliott

07101407And on the groundDE

The frames have landed! – David Elliott

07101410Dave Brown from North View Engineering welds on doubler plateDE

Wasting no time, Dave Brown from North View Engineering welds a doubler on – David Elliott

07101411Plate held vertically to complete weldDE

The frames are uprighted to facilitate this – David Elliott